Pool makeover and more…
This project was our last install of 2019 and ran right up to Christmas break. We were contracted to demo and reinstall an entry pathway and pool deck utilizing a Gator Base install (ask us about what that is). We also installed the pool and spa coping, a complete drainage package, two separate turf zones, and while we were at it…a gas fire pit.
This project required a heavy round of demolition and working with a few unique trades to address additional remodel plans. As with any project in Winter Park, we worked through a handful of surprises but ultimately wrapped up over 3,500 s/f under foot install utilizing an Old Chicago brick for the front path. For the pool deck, coping, pathway to dock, and spa tile we sourced a silver travertine. And for the turf we installed both an in-lay pattern and a flush to spa zone.
This was one of the most complex projects we’ve taken on and we couldn’t be happier with the finished product. As a result we have now added a complete landscape design service to our offerings and will be booking complete remodels all year. If you are looking for a one stop shop that won’t sub out the labor, we are your guys!